Completed work
Tasks implemented during the project:
-
construction of a simplified model of Vnukovo airport, road and railway infrastructure and the surrounding area with a total area of about 100 km²;
-
visualization of changes in the state of the terrain on a 3D model;
- the ability to monitor and simulate the movement of aircraft and ground transportation. The model was created using automatic technologies in the Microstation V8 software. GeoEye-1 satellite images with a spatial resolution of 0.5 meters were used as the initial data of the model. The simplified model was created using the 2.5D technology together with the TerraSpace company.
Results
Creating a 3D-model of the Vnukovo Airport to monitor construction works.