Completed works
Within the scope of the work, the following stages were implemented:
1. Investigation of the Sardobin Reservoir area (Uzbekistan) prior to the dam breach (August 2017 - May 2020). When processing satellite images from the Sentinel-1A/B satellite, acquired from the same orbit, the natural reflectance method was applied. A graph of ground surface displacement was obtained prior to the dam breach. As seen from the graph, the displacement amounted to 90 mm over three years.
2. We also conducted research on displacements after the dam repair (May 2020 - June 2022). We obtained a graph of displacements, which indicates displacements of up to 30 mm over two years.
CONCLUSION: Critical ground surface displacement preceded the breach, and after the dam repair, the displacement persists but at lower values.
3. We conducted research on ground surface displacements in the area of the Akhangaran Reservoir (Uzbekistan) (November 2017 - June 2022) using the permanent reflectors method.
4. We obtained corresponding displacement graphs. Example graphs for selected points:
CONCLUSION: Displacements exhibit cyclic patterns depending on the water surface area (seasonal variations). Maximum amplitudes are observed in the upper part of the dam.